My house is still moving along. They keep saying that I will be in by Thanksgiving. I was a little worried when I ordered the bathroom tiles and instead of being a 5-6 week turn around time, it was 10-12 weeks. But luck was with me and the tiles came in 5 weeks so now they are being laid. They started with the original bathroom.
Alec and Brooks put up their sign
Alec and Brooks put up their sign
No comments:
Post a Comment